Setting up the supermatter engine is a case of going in a big circle. Refer to the image on the right for steps 2, 3 and 4. | Setting up the supermatter engine is a case of going in a big circle. Refer to the image on the right for steps 2, 3 and 4. | ||
#At points 1 and 2 set these pumps both to on and max output pressure (4500kpa) | #At points 1 and 2 set these pumps both to on and max output pressure (4500kpa) | ||
#At point 4 turn the pump off ''You don't want the coolant gas to bypass the SM do you?'' | #At point 4 turn the pump off ''You don't want the coolant gas to bypass the SM do you?'' | ||
#At point 5 turn the filter on, set it to max output pressure (4500kpa) and set it to filter nothing | #At point 5 turn the filter on, set it to max output pressure (4500kpa) and set it to filter nothing | ||
Line 30: | Line 28: | ||
#At point 13 wrench the two N2 canisters | #At point 13 wrench the two N2 canisters | ||
#At point 13 turn both of the pumps on and set them to max output pressure (4500kpa) | #At point 13 turn both of the pumps on and set them to max output pressure (4500kpa) | ||
#At point 3 set the air alarm scrubber controls to "Mode: '''Siphoning'''" and "Range: '''Expanded'''" | |||
#At point 3 set the air alarm vent controls to "'''Internal''' Target Pressure: 0 Kpa", while disabling '''External''' | |||
#Finally, ensure that gas is flowing through the system via gas flow meters, if not double check all steps or where there is build up. | #Finally, ensure that gas is flowing through the system via gas flow meters, if not double check all steps or where there is build up. | ||