#At point 13 wrench the two N2 canisters
#At point 13 wrench the two N2 canisters
#At point 13 turn both of the pumps on and set them to max output pressure (4500kpa)
#At point 13 turn both of the pumps on and set them to max output pressure (4500kpa)
#Finally, ensure that gas is flowing through the system via gas flow meters, if not double check all steps or where there is build up.


====Step 3: Plasma====