870
edits
(Don't be afraid to hit the bold button) |
(CE/RD IPC my belovedloathed) |
||
(One intermediate revision by the same user not shown) | |||
Line 10: | Line 10: | ||
|homeworld = N/A | |homeworld = N/A | ||
|central authority = Sol Interplanetary Coalition | |central authority = Sol Interplanetary Coalition | ||
|allowed command roles = | |allowed command roles = [[Chief Engineer]], [[Research Director]] | ||
|guides = No external guides | |guides = No external guides | ||
|paycheck=0.6x}} | |paycheck=0.6x}} | ||
Line 25: | Line 25: | ||
===== Notes ===== | ===== Notes ===== | ||
* The joints in the IPC head are weak and susceptible to being knocked off. | * The joints in the IPC head are weak and susceptible to being knocked off. | ||
* Cooling system relies on air in surrounding environment. Superheated gases will disrupt and damage internal circuitry unless external, tank-based supply of gas is used. Standard pressure distribution of internals canisters is insufficient for cooling; target pressure is around ''' | * Cooling system relies on air in surrounding environment. Superheated gases will disrupt and damage internal circuitry unless external, tank-based supply of gas is used. Standard pressure distribution of internals canisters is insufficient for cooling; target pressure is around '''24 kPa''' in a standard oxygen tank. | ||
===== Material Statistics ===== | ===== Material Statistics ===== | ||
* Construction burns one and a half times as fast compared to a normal human. | * Construction burns one and a half times as fast compared to a normal human. |
edits