Guide to Setting Up the Singularity: Difference between revisions

Jump to navigation Jump to search
Added revision note, removed the engineering-category since this page is a redirect and the only entry of said category
(Added revision note, removed the engineering-category since this page is a redirect and the only entry of said category)
 
(7 intermediate revisions by 3 users not shown)
Line 1: Line 1:
{{Needs revision|Most screenshots of Engineering are out-of-date|[[User:Spankymcpants|Spankymcpants]] ([[User talk:Spankymcpants|talk]]) 06:33, 9 February 2015 (UTC)}}
#REDIRECT [[Singularity Engine]]
{{Needs revision
|reason=Remove the content of this article since there is a redirect anyways?
|user=[[User:Helpful Herbert|Helpful Herbert]] ([[User talk:Helpful Herbert|talk]]) 15:23, 30 April 2020 (UTC)
}}


<font size=5> '''Welcome to Engineering, scrub!''' </font>
<center><font size=5> '''Welcome to Engineering, scrub!''' </font></center>


This is where you'll start off. It's a scary place out there, but have no fear! Except for the singularity. Fear '''''LORD SINGULOTH'''''.
<center>This is where you'll start off. It's a scary place out there, but have no fear! Except for the singularity. Fear '''''LORD SINGULOTH'''''.</center>


[[File:singoguide.png|center]]
[[File:singoguide.png|center]]


= IMPORTANT =
This guide is outdated.
Updated guide on setting up the singularity is here: [[Singularity Engine]]


= Introduction =
= Introduction =
The primary and by far the strongest energy generator for the station is the Singularity Engine, which draws on the raw and mighty power of a black hole, otherwise known as a ''singularity'', otherwise known as the ''singlo'', otherwise known as '''''LORD SINGULOTH, DEVOURER OF ENGINEERING'''''.  
The primary and by far the strongest energy generator for the station is the Singularity Engine, which draws on the raw and mighty power of a black hole, otherwise known as a ''singularity'', otherwise known as the ''singlo'', otherwise known as '''''LORD SINGULOTH, DEVOURER OF ENGINEERING'''''.  


Line 76: Line 84:
'''Tools needed:''' none
'''Tools needed:''' none


This is the quickest way to set the SMESs, but not the most optimal. See [[Guide_to_Setting_Up_the_Singularity#Advanced SMES Configuration|Advanced SMES Configuration]] for more information on optimizing the singlo SMESs during singularity engine set-up.
This is the quickest way to set the SMESs, but not the most optimal. For the optimal way, see [[#Advanced SMES Configuration|Advanced SMES Configuration]].


# Set ''Input'' from Off to On (or Auto).
# Set ''Input'' from Off to On (or Auto).
# Increase ''Input level'' to Maximum (200 kW).
# Increase ''Setting'' in the ''Input'' section to Maximum (200 kW).
# Increase ''Output level'' to Maximum (200 kW).
# Increase ''Setting'' in the ''Output'' section to Maximum (200 kW).
# Repeat on all three (3) SMES cells.
# Repeat on all three (3) SMES cells.


Line 90: Line 98:
'''Tools needed:''' none
'''Tools needed:''' none


Because SMESs draw power in a set order, or ''power queue'', and since the station only draws about 150kW in the early part of the shift, the SMES output can be optimized to charge all SMESs evenly, meaning that no excess energy is wasted trying to charge already full SMESs. To do this, the output level on the first two SMESs in the power queue needs to set lower than maximum while the final SMES in the queue needs to be set to maximum to cover power fluctuations. We'll choose 50kW for the output levels on SMESs #1 and #2 since that is equivalent to ~150kW split among the 3 SMESs.
Because SMESs draw power in a set order, or ''power queue'', and since the station only draws about 150kW in the early part of the shift, the SMES output can be optimized to charge all SMESs evenly, meaning that no excess energy is wasted trying to charge already full SMESs. To do this, the output level on the first two SMESs in the power queue needs to set lower than maximum while the final SMES in the queue needs to be set to maximum to cover power fluctuations. 50kW should be used for the output levels on SMESs #1 and #2 since that is equivalent to ~150kW split among the 3 SMESs.


# For each cell, set ''Input'' from Off to On (or Auto).
# For each cell, set ''Input'' from Off to On (or Auto).
# Increase ''Input level'' to Maximum (200 kW).
# Increase ''Setting'' in the ''Input'' section to Maximum (200 kW).
# '''On SMESs #1 and #2:''' Manually set ''Output level'' to 50000 W (50 kW), if necessary.
# '''On SMESs #1 and #2:''' Manually change ''Setting'' in the ''Output'' section to 50000 W (50 kW), if necessary.
# '''On SMES #3:''' Increase ''Output level'' to Maximum (200 kW).
# '''On SMES #3:''' Increase ''Setting'' in the ''Output'' section to Maximum (200 kW).


These output settings may need to be set to Maximum later, after the SMESs are fully charged, when [[backup SMESs]] are wired up and charging, or if a [[power sink]] has drained station power. Otherwise, the SMESs are optimized for now. Move on to the next section.
These output settings may need to be set to Maximum later, after the SMESs are fully charged, when [[backup SMESs]] are wired up and charging, or if a [[power sink]] has drained station power. Otherwise, the SMESs are optimized for now. Move on to the next section.
Line 424: Line 432:


[[Category:Guides]]
[[Category:Guides]]
[[Category:Engineering]]