Singularity Engine: Difference between revisions

247 bytes added ,  15:44, 5 December 2019
m
Line 76: Line 76:
*'''ONLY IF''' you have permission from command or you know what you are doing, it is possible to wire the engines directly to the main power ring. A good spot to do this is to the west side of engineering, near the bolted airlock. Lift the floor tiles and run a wire from there out into the maintenance tunnel and link it to the wire running through there. This allows you to charge [[APC]]s directly if somebody disables the SMES in Engineering and keeps the station running in case of a  [[powersink]].
*'''ONLY IF''' you have permission from command or you know what you are doing, it is possible to wire the engines directly to the main power ring. A good spot to do this is to the west side of engineering, near the bolted airlock. Lift the floor tiles and run a wire from there out into the maintenance tunnel and link it to the wire running through there. This allows you to charge [[APC]]s directly if somebody disables the SMES in Engineering and keeps the station running in case of a  [[powersink]].
**'''The downside to this is that when anyone accidentally gets shocked by an electric grille or an electrified door, they will receive severe damage. <span style="color:red">Only do this on rare occasions, or never!</span>'''
**'''The downside to this is that when anyone accidentally gets shocked by an electric grille or an electrified door, they will receive severe damage. <span style="color:red">Only do this on rare occasions, or never!</span>'''
*You can also set up a dual engine design that utilizes both tesla and the singularity. This however requires a lot of experience, requires a well-tested design robust enough to handle both in containment and is also probably not worth the risk.


*If you added the maximum amount of plasma to the collectors, this modification can generate ~6,000 kW of power for the station. Enough to charge the 4 Engineering SMES and the 4 Solar SMES at 200 kW input. Therefore, run a tiny bit of wire from the maintenance tunnels to each solar SMES, and set them each of them to an input/output of 90,000/30,000. This will ensure massive amounts of power reserves (enough to last hours with the engine off).
*If you added the maximum amount of plasma to the collectors, this modification can generate ~6,000 kW of power for the station. Enough to charge the 4 Engineering SMES and the 4 Solar SMES at 200 kW input. Therefore, run a tiny bit of wire from the maintenance tunnels to each solar SMES, and set them each of them to an input/output of 90,000/30,000. This will ensure massive amounts of power reserves (enough to last hours with the engine off).