Singularity Engine: Difference between revisions

32 bytes added ,  18:48, 14 September 2019
Line 73: Line 73:
<div class="mw-collapsible-content">
<div class="mw-collapsible-content">
*'''ONLY IF''' you have permission from command or you know what you are doing, it is possible to wire the engines directly to the main power ring. A good spot to do this is to the west side of engineering, near the bolted airlock. Lift the floor tiles and run a wire from there out into the maintenance tunnel and link it to the wire running through there. This allows you to charge [[APC]]s directly if somebody disables the SMES in Engineering and keeps the station running in case of a  [[powersink]].
*'''ONLY IF''' you have permission from command or you know what you are doing, it is possible to wire the engines directly to the main power ring. A good spot to do this is to the west side of engineering, near the bolted airlock. Lift the floor tiles and run a wire from there out into the maintenance tunnel and link it to the wire running through there. This allows you to charge [[APC]]s directly if somebody disables the SMES in Engineering and keeps the station running in case of a  [[powersink]].
 
**'''The downside to this is that when anyone accidentally gets shocked by an electric grille or an electrified door, they will receive severe damage. <span style="color:red">Only do this on rare occasions, or never!</span>'''
'''The downside to this is that when anyone accidentally gets shocked by an electric grille or an electrified door, they will receive severe damage. Only do this on rare occasions, or never!'''


*If you added the maximum amount of plasma to the collectors, this modification can generate ~6,000 kW of power for the station. Enough to charge the 4 Engineering SMES and the 4 Solar SMES at 200 kW input. Therefore, run a tiny bit of wire from the maintenance tunnels to each solar SMES, and set them each of them to an input/output of 90,000/30,000. This will ensure massive amounts of power reserves (enough to last hours with the engine off).
*If you added the maximum amount of plasma to the collectors, this modification can generate ~6,000 kW of power for the station. Enough to charge the 4 Engineering SMES and the 4 Solar SMES at 200 kW input. Therefore, run a tiny bit of wire from the maintenance tunnels to each solar SMES, and set them each of them to an input/output of 90,000/30,000. This will ensure massive amounts of power reserves (enough to last hours with the engine off).
System Operators, Wiki Staff
839

edits