Guide to construction: Difference between revisions

m
→‎Air Alarm: updating air alarm deconstruction
imported>Ahammer18
imported>Phil235
m (→‎Air Alarm: updating air alarm deconstruction)
Line 604: Line 604:
|rowspan="2" colspan="3"|
|rowspan="2" colspan="3"|
# Open cover with '''screwdriver'''.
# Open cover with '''screwdriver'''.
# Cut all the wires using '''wirecutters'''.
# Cut all wires except the syphon wire using '''wirecutters'''.
# Cut the remaining wires with '''wirecutters'''.
# Use '''wirecutters''' on the air alarm to cut the remaining wires.
# Pry out the circuit using the '''crowbar'''.
# Pry out the circuit using the '''crowbar'''.
# Remove the frame from the wall using the '''wrench'''.
# Remove the frame from the wall using the '''wrench'''.
Anonymous user